IMC was able to work with the client to incorporate the new geotechnical criteria in their pit optimisation and design process. This involved minimising the need for additional waste stripping.
Using advanced strategic scheduling and mathematical modelling, IMC Mining was able to provide the client with a revised life of mine plan, carat profile, waste dumping sequence as well as equipment requirements. The strategic mine plan was validated using tactical planning tools to ensure that the highest value development sequence was practical and executable.